RFP Database

Find HVAC Control Systems RFPs and Bid Opportunities

Find open HVAC Control Systems RFPs from state agencies, local governments, school districts and higher ed institutions.

20 opportunities shown.

  1. Escanaba Housing Commission

    Special DistrictMI

    Commercial HVAC Controls & BAS Integration RFP

    Scope Summary: Furnishing and installing duct-mounted exhaust temperature sensors, hydronic reheat control valve and space sensor for hallway heating, associated BAS controller expansion modules, conduit, low-voltage wiring, programming, commissioning, and as-built documentation.

  2. Water Treatment Facility - HVAC Improvements

    Work includes removal and disposal of ACU-8 and associated ACC-2, ACU-9 and associated ACC-3, ACU-10 and associated ACC-5, ACU-11 and associated acc-6, ACU-7 and associated ACC-4, ACU-6 and associated ACC-1 and all associated refrigeration piping, piping accessories and supports serving the main water plant.

  3. King County

    CountyWA

    Shoreline Transfer Station Dust Control Project RFP

    Construct mezzanine partition wall; misting system modifications and controls; mezzanine supply fan installation; demolition of dust hood and duct capping; air barrier repairs; hvac testing and balancing; general conditions; contractor engineering; apprenticeship utilization incentive.

Recent buying indicators

Recent board meeting, budget, plan, and contract evidence, connected to the buyer and relevant decision-makers.

Why now

- CET's Comprehensive Building Assessment for Sanderson Academy found the school's energy management system locked out due to Java support issues, operating autonomously with no remote access. - The assessment recommends a BMS upgrade (ECM-1) with an estimated installed cost of $135,900 and projected annual savings of $14,480, planned for July 2026. - The Town of Ashfield is seeking Green Communities designation support, with a Supplemental Energy Reduction Plan updated to cover 62% of the school's energy use. - The assessment notes the facility lacks a DDC-based building management system capable of reporting data required for…

Meeting MentionPre-RFPDetected: Oct 5
Key Contacts · Verified by Starbridge
George Stephan
EM Director
Jonisha Aubain
Energy Manager

Why now

- Facilities director Mike presented a district-wide priority to upgrade building controls, panels, and thermostats, noting they were installed ad hoc over 30–40 years and some still run Windows XP. - The district is partnering with the city on the controls upgrade and hopes an energy efficiency project with Eneria will focus on these controls, though that project is not yet confirmed. - The district began HVAC scoping at Shelter Rock to add AC to under-cooled pods, with staff already speaking to vendors about bids for different HVAC system styles. - The district is exploring air conditioning for several elementary schools including…

Meeting MentionPre-RFPDetected: Sep 17
Key Contacts · Verified by Starbridge
Sarah Roy
Academy Director
Crystal L Taft
Assistant Director of Special Education
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts