Bank Stabilization Moccasin Creek RFP
Project consists of work on three lateral channels.
Description: Work includes 1 LS earthwork (500 CY of excavation); 1 LS clearing and grubbing; 86 CY class ii aggregate base; 38 tn hot mix asphalt (type a) - 3" thick; 100 LF minor concrete, curb and gutter, 1.5'; 50 L minor concrete, 4" sidewalk; 367 SF minor concrete, 4" sidewalk (thickened edge); 40 Lpaint - red curb; thermoplastic traffic striping - 6".
City · CA, US
Solicitation files and supporting documents for this bid.
These related opportunities are still open for bidding.
Johnston Soil And Water Conservation District
Special DistrictNC
Posted
Sep 29, 2026
Oct 15, 2026
Project consists of work on three lateral channels.
Minnesota State University Mankato
Higher EducationMN
Posted
Oct 1, 2026
Oct 22, 2026
Works include approx. 1,890 CY common excavation (EV) (P); 850 LF of silt fence, type MS; 267 LF of 18" storm sewer; 7 EA storm sewer casting assembly.
CityCA
Posted
-
Oct 20, 2026
Work generally consists of mobilization, traffic control, implementing a water pollution control plan, relocating approximately 174 feet of 6inch sewer, removing an existing manhole, repairing/stabilizing roadway by installing a new retaining wall, cleanup of the project area, and other items of work as shown on the plans. Work includes 50 CY (f) roadway excavation; 1 LS erosion control; 210 SF asphalt paving; 174 LF 8" hdpe sewer main - open cut; 179 LF abandon existing sewer and fill with grout. See attached file.
Posted
Oct 7, 2026
Oct 29, 2026
Project generally consists of building stabilization measures and installation of a monitoring system including but not limited to installation of netting, removal of building material, set up of a monitoring system, installation of a protective support structure for the existing tower and all other associated work