CityIL
Posted
Oct 14, 2026
Oct 30, 2026
2027 & 2028 Water & Sewer Maintenance Division Emergency Repair Program RFP
Work includes 4" stainless steel repair clamp, 12", 8" stainless steel repair clamp, 12", 4" ductile iron pipe, 4" mj resilient wedge gate valve, 6" insertion valve, 1" copper water service, pavement sawcutting, pavement removal and disposal, pcc sidewalk removal, driveway pavement removal, curb and gutter removal, barricades, type 2 w/ steady burn lights, advanced warning signs. See outside link.
