West Calcasieu Port Harbor Terminal District
Special DistrictLA
Posted
Oct 1, 2026
Oct 29, 2026
Dock Infrastructure Improvements Laydown Yard RFP
Construction of a new aggregate laydown yard, aspahlt drive, site drainage, and fencing.
Description: City yard improvements project. Project will construct a retaining wall, remove existing asphalt pavement, and construct a new asphalt base and surface for a portion of the city yard. Additional improvements include installing fencing with two automatic sliding gates and applying new pavement striping.
City · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
West Calcasieu Port Harbor Terminal District
Special DistrictLA
Posted
Oct 1, 2026
Oct 29, 2026
Construction of a new aggregate laydown yard, aspahlt drive, site drainage, and fencing.
CityIA
Posted
Oct 6, 2026
Oct 27, 2026
Approx. 28 minor adjustments to manholes with PCC boxouts, 1,747 LF of PCC curb and gutter, 21,820 SY of 1.5" thick intermediate layer asphalt overlay, 21,820 SY of 1.5" thick surface layer asphalt overlay, 21,820 SY of asphalt milling, 8 SY of 4" thick PCC sidewalk, 8 SY of sidewalk removal, 3 STA of pavement markings, asphalt and PCC samples and testing, traffic control, mobilization, SWPPP control measures, and other related items.
CountyTX
Posted
Oct 14, 2026
Oct 30, 2026
Work includes approx 2,219 LF of 6" PVC waterline (open cut); 140 LF of 2" PVC waterline (open cut); 18 EA of 2" SCH 40 PVC 45 deg bend; 403 LF of saw cur asphalt.
CityOH
Posted
-
Oct 22, 2026
The City of Moraine seeks to expand the parking lot and make related improvements at the Moraine Municipal Building, 4200 Dryden Road. The base bid covers asphalt and concrete work to expand the lot where the existing parking canopy is located; alternates include a wrought-iron fence with motorized gates, a dumpster pad and parking relocation, and utility conduits and lighting. The project is intended for spring 2027, with completion due by June 30, 2027, and optional improvements may be awarded as budget allows.
Decision makers connected to this RFP from City of Alhambra.