OtherFL
Posted
-
Oct 19, 2026
Bayfront Medical Plaza 3rd Floor Common Area St Petersburg, FL RFP
Provide bayfront medical plaza 3rd floor common area.
Description: Project consists of the complete removal and replacement of the flooring system on the second-floor common areas (hallway, laundry room, closets, storage room and in front of elevator). Removal and replacement of all existing metal thresholds or floor transition strip between corridor and all units, including closets, storage rooms and stair a & b. Removal and replacement of existing vinyl composition tiles (vct), cove base (vinyl) and all floor underlayment gypsum concrete topping (1 gypcrete), and including any felt vapor barrier. Replace as specified in the project drawings and specifications. Verify in field (v. I. F. ).
SpecialDistrict · OH, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Cuyahoga Metropolitan Housing Authority.
Adjacent opportunities open for bidding right now.
OtherFL
Posted
-
Oct 19, 2026
Provide bayfront medical plaza 3rd floor common area.
Essexville-Hampton Public Schools
School DistrictMI
Posted
Oct 8, 2026
Oct 23, 2026
Essexville-Hampton Public Schools is seeking proposals from qualified, licensed flooring contractors to remove and replace the gym floor at Verellen Elementary School in Essexville, Michigan. The work includes removing approximately 3,780 square feet of existing VCT, preparing and leveling the concrete substrate, and installing Tarkett Sports Indoor Omnisports Multi-Use vinyl sports flooring in Blue Maple, with court markings and related wall-base and transition work. The contractor must also provide freight, protect the site and control dust and odor, complete cleanup and a final walkthrough, and provide closeout materials including warranty and maintenance information.
Essexville-Hampton Public Schools
School DistrictMI
Posted
Oct 8, 2026
Oct 23, 2026
Essexville-Hampton Public Schools is seeking proposals from qualified, licensed flooring contractors to remove and replace the gym floor at Verellen Elementary School in Essexville, Michigan. The work includes removing approximately 3,780 square feet of existing VCT, preparing and leveling the concrete substrate, and installing Tarkett Sports Indoor Omnisports Multi-Use vinyl sports flooring in Blue Maple, with court markings and related wall-base and transition work. The contractor must also provide freight, protect the site and control dust and odor, complete cleanup and a final walkthrough, and provide closeout materials including warranty and maintenance information.
Charles Stewart Mott Community College
Higher EducationMI
Posted
Oct 12, 2026
Oct 26, 2026
The solicitation seeks offers for the work identified as RTC Floor Repairs & Installation. It is listed under reference RFP-GA-1026-RTCRepairs&Installation, with responses due October 26, 2026, at 1:00 p.m. EDT. The public notice does not expose the work description or bid documents.