Posted
Aug 5, 2026
Oct 29, 2026
Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Thermo Cured Products)
Provide cured in place pipe (CIPP) for pipeline rehabilitation (thermo cured products).
Description: Project consists of providing all labor, materials, equipment and services necessary to clean and rehabilitate approximately 850 LF of existing 8" asbestos cement (AC) sewer main including 19 service laterals and 7 manholes using the Cured-in-Place Pipe (CIPP) method by resin-impregnated liner or UV light cure. All work to be performed during overnight hours when traffic and sewage flows are lowest.
City · MA, US
Solicitation files and supporting documents for this bid.
These related opportunities are still open for bidding.
Posted
Aug 5, 2026
Oct 29, 2026
Provide cured in place pipe (CIPP) for pipeline rehabilitation (thermo cured products).
Posted
Aug 5, 2026
Oct 29, 2026
Provide cured in place pipe (CIPP) for pipeline rehabilitation (ultraviolet-light-cured products).
Brunswick-Glynn Joint Water And Sewer Commission
Special DistrictGA
Posted
Oct 7, 2026
Nov 10, 2026
Work includes approx 27,187 LF 12" sanitary sewer mainline pre-cleaning inspection; 26,115 LF 8" CIPP mainline rehabilitation by resin-impregnated tube; 1 Ls bypass pumping.
Brunswick-Glynn Joint Water And Sewer Commission
Special DistrictGA
Posted
Oct 7, 2026
Nov 10, 2026
Work includes approx 27,187 LF 12" sanitary sewer mainline pre-cleaning inspection; 26,115 LF 8" CIPP mainline rehabilitation by resin-impregnated tube; 1 Ls bypass pumping.
Decision makers connected to this RFP from Town of Chatham.