CityNC
Posted
Sep 29, 2026
Oct 22, 2026
Downtown Dumpster Enclosures Project RFP
Work includes construction of one dumpster enclosure and additions to three existing dumpster enclosures.
Description: Downtown walkable corners project includes mobilization & demobilization, installation of pedestrian refuge islands and bulb outs; catch basin relocations; raised median island; traffic control; survey; removals; cold milling; asphalt concrete; portland cement concrete curb, gutter, medians, sidewalk, curb ramps, utility access cover adjustments; traffic signals; signing, striping and markings and modifications; and other appurtenant work. See attached file.
City · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityNC
Posted
Sep 29, 2026
Oct 22, 2026
Work includes construction of one dumpster enclosure and additions to three existing dumpster enclosures.
CityIL
Posted
Oct 15, 2026
Oct 28, 2026
Work consists of replacing curbs and pavement, installing new monument sign and fountain, and delegated design / installation of electric service.
CityFL
Posted
-
Nov 10, 2026
This construction includes a new circular wet well, submersible pumps, above grade piping, valves, electrical equipment, I&C equipment, permanent emergency standby diesel bypass pumps, odor control, access driveway, associated site fencing and landscaping, open-cut placement of 150 LF of 18” SDR 26 PVC gravity main, and boring of approximately 4,300 LF of 16” DR-11 HDPE and open-cut placement of 350 LF of 16” C-900 PVC sewage force main.
Ticonderoga Joint Town/Village Fire District
Special DistrictNY
Posted
Sep 21, 2026
Oct 19, 2026
DESIGN-BUILD Streetscape and Connectivity Improvements: Beautify the Montcalm Streetscape & Link Adirondack Drive to the La Chute Riverfront.
Decision makers connected to this RFP from City of Long Beach.