Connecticut Office of the Attorney General
State AgencyCT
Posted
Sep 5, 2026
Oct 21, 2026
Safety Improvements at Portland Ave & Depot Rd Railroad Crossing RFP
Excavation, removal of concrete, joint and crack sealing, bridge sidewalk concrete.
Description: The Project consists of paving, signage and striping of two (2) highway-rail grade crossing.
County · TN, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Knox County.
Adjacent opportunities open for bidding right now.
Connecticut Office of the Attorney General
State AgencyCT
Posted
Sep 5, 2026
Oct 21, 2026
Excavation, removal of concrete, joint and crack sealing, bridge sidewalk concrete.
CityWI
Posted
Sep 9, 2026
Oct 27, 2026
Reconstruction of thirteen (13) existing at- grade railroad crossings.
CityWA
Posted
Oct 14, 2026
Nov 4, 2026
The City of Seattle is soliciting sealed bids for pedestrian-crossing safety improvements at eight intersections in south Seattle, with an engineer’s estimate of $3.25 million to $3.35 million. Work includes sidewalk and pavement removal and restoration, pedestrian islands, curbs and curb ramps, drainage, landscaping, RRFB and traffic signals, signing, channelization, and electrical and rebar installation. The posting describes an FHWA-funded project and sets the bid opening for November 4, 2026, at 2:00 p.m. Pacific.
CityMT
Posted
Sep 11, 2026
Oct 20, 2026
Project generally consists of the following major items: •Replacement of the existing 12” cast iron water main from O’Brien Ave to Edgewood PI, with 1,035 linear feet of new 12” diameter C151 ductile iron pipe and fittings.\r •Installation of approximately 312 linear feet of 24” diameter steel casing jack and bore across BNSF railway right-of-way and installing associated cathodic protection.\r •Abandoning existing water main in-place under the BNSF railway right-of-way (existing water main under the railroad tracks will be abandoned by pressure grouting).\r •Installation of 334 linear feet of new 8” diameter C900 PVC pipe and fittings along Railway St. \r •Asphalt replacement along water main installation on O’Brien Ave, Railway St, and in parking lot south of Edgewood Pl.