Culvert and Gabionwall Repair Project RFP
Traffic protection & maintenance. Removal of trees. Remove and re-install 37 LF of existing guiderail. Relocate gas service. Remove and dispose of 20 CY of native material. Furnish and install precast wingwall on downstream side of existing box culvert. Furnish and install 115 tons of class 3 rip rap. Profile and grade 20 CY of drainage course into plunge pool. Raffic protection & maintenance. Removal of trees. Removal and disposal of existing gabion & stone walls for diversion swale. Removal and disposal of native soil. Bracing of existing utility pole. Furnish and install 18 tons of crushed gravel for leveling pad for segmental precast concrete wall. Furnish and install 182 LF of segmental precast reinforced concrete wall. Furnish and install 260 SY of geogrid reinforcement. Furnish and install 300 CY of crushed gravel for segmental wall backfill. Removal and re-installation of pedestrian bridge for 217 mountain road. Furnish and install 70 LF of guide rail. Furnish and install 11 guide rail posts. Furnish and install 2 end sections for guide rail. Furnish and install 32 tons of class 2 rip rap. Furnish and install 40 tons of binder. Furnish and install 27 tons of topcoat. Rock excavation 20 CY. Relocate three existing water service lines. Relocate three existing gas service lines.