CountyIL
Posted
-
Nov 9, 2026
Phase I & Phase II Engineering Services w/options for Phase III in Stephenson County (Request for Proposal)
Seeking engineering services. Construction inspection, shall be included as an option.
Description: Work includes 575 LF conduit, furnish & install, open trench; 15 LF conduit, furnish & install, directional bore; 20 LF conduit, furnish & install, aboveground; 101 ea fiber optic connection hardware, relocate patch panel- field terminated; 503 LF multi-conductor communication cable, furnish & install, cat 6; 21 EA pull & splice box, f&i, 13" x 24" cover size; 1 as electrical power service, f&i, underground, meter purchased by contractor; 1,010 LF electrical service wire, furnish & install; 25 LF electrical service wire, relocate; 315 LF electrical service wire, remove. See attached file.
County · FL, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Orange County.
Adjacent opportunities open for bidding right now.
CountyIL
Posted
-
Nov 9, 2026
Seeking engineering services. Construction inspection, shall be included as an option.
CityIL
Posted
Oct 9, 2026
Nov 2, 2026
The solicitation seeks Phase I and Phase II engineering for the design of a pedestrian crossing and ADA-compliant transit landing pads. The engineering is to be performed in accordance with IDOT requirements. It is also to comply with federal requirements.
Posted
Oct 12, 2026
Oct 23, 2026
Provide building 510 substation upgrade - phase 1. The Contractor shall provide all labor, supervision, materials (except as noted below), equipment, and services necessary for complete removal and upgrading of the existing Building 510 electrical substation equipment that feeds the newly replaced electrical distribution switchgear. This project includes the removal of two medium voltage substation transformers, one medium voltage oil switch and medium voltage distribution cabling. The project also includes the installation of a new exterior substation with two new medium voltage transformers, one pad mounted medium voltage switchgear and medium voltage feeders in a new concrete encased duct bank.
Rancho Santiago Community College District
Higher EducationCA
Posted
Sep 13, 2026
Oct 28, 2026
Work includes education center portables project phase ii project.