Beaver Ruin Diversion Pump Station Grinders Replacement Project -*REBID*
Project includes the following Work: 1) Replacement and installation of the three (3) existing grinder units with new rail systems, channel modifications, and control panels. 2) Replacement and installation of the three (3) existing influent slide gates with actuators. 3) Replacement and installation of the three (3) existing effluent slide gates. 4) Replacement and installation of the two (2) existing influent wet well slide gates. 5) Replacement and installation of one (1) existing wet well crossover slide gate. 6) Raising of concrete wet well baffle wall and platform elevations. 7) Relocation and re-installation of existing flushing system. 8) Installation of electrical conduit and designed routing with MCC configuration.