Utah Department of Government Operations
State AgencyUT
Posted
Sep 30, 2026
Oct 28, 2026
Description: The City of Kingston seeks professional engineering services from preliminary design through construction administration for mechanical replacements at Rideaucrest Home, its non-profit long-term care facility. The scope includes water source heat pump terminal units, high-wear components of existing make-up air units, fluid coolers, and the domestic hot water system with associated equipment. This invitation-only second-stage RFP includes an initial options analysis to explore alternative systems and strategies for reducing energy use and greenhouse gas emissions.
City · ON, CA
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Kingston.
Adjacent opportunities open for bidding right now.
Utah Department of Government Operations
State AgencyUT
Posted
Sep 30, 2026
Oct 28, 2026
Work includes replace existing unit heaters.
CityNJ
Posted
Sep 29, 2026
Oct 27, 2026
Installation of a new 350 kW indoor diesel generator, 800A ATS, 800A portable generator connection panel, day tank, 500-gal. outdoor above ground diesel fuel tank (AST), fuel transfer pump system, fuel piping, louvers and associated ducts, conduits, wires.
State AgencyON
Posted
Sep 24, 2026
Nov 4, 2026
Defence Construction Canada seeks abbreviated proposals from consulting firms for professional services to replace building fire protection systems, including aqueous film-forming foam systems, at CFB Bagotville and its satellite sites in Quebec. Proposals will be evaluated against the criteria in the request, with the highest-scoring proponent selected. The selected consultant must hold a valid Designated Organization Screening under the federal Contract Security Program.
Utah Department of Health and Human Services
State AgencyUT
Posted
Sep 30, 2026
Oct 27, 2026
Bids are requested from Stage II Prequalified Mechanical Contractors for construction services to replace existing rooftop units, exhaust fans, evaporative coolers, and unit heaters.