Rampart Range Metropolitan District 1
Special DistrictCO
Posted
Oct 1, 2026
Nov 12, 2026
RidgeGate Hillcamp Trail Roadway Project RFP
Project consists of but is not limited to; installation and maintenance of erosion control Best Management Practices (BMPs), installation of approx 2,830 LF of roadway, installation of RCP Storm pipe ranging in size from 18" to 30", installation of Type R inlets, Type D inlets, 5' storm manholes, and two (2) hydrodynamic separators. Also included is the installation of two sets of tiered retaining walls, as well as a Pedestrian Bridge, abutments and site walls.
