CityPA
Posted
Sep 6, 2026
Oct 22, 2026
Description: Work includes 6,600 SY remove existing concrete sidewalk; 5,400 SY install 4" concrete sidewalk; 1,200 SY install 6" concrete sidewalk / driveway crossing; 5 EA ada curb ramp improvements; 50 SF detectable warning surface; 50 LF concrete curb / curb & gutter repair; 25 SY asphalt pavement restoration; 50 SY sod / landscape restoration; 10 ea tree root removal / root pruning; 25 CY unsuitable material removal and replacement. See attached file.
City · FL, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Dania Beach.
Adjacent opportunities open for bidding right now.
CityPA
Posted
Sep 6, 2026
Oct 22, 2026
The project is for bridge and culvert rehabilitation at six locations. The work includes, but is not limited to, masonry cleaning and selective repointing; selective concrete replacement; inlet opening modifications; concrete underpinning; stabilization using shotcrete; scour infill with rip rap; bank stabilization; guiderail modifications and stabilization; temporary erosion and sediment control measurers; temporary stormwater bypass; and site restoration.
CityAL
Posted
Oct 11, 2026
Nov 12, 2026
The work includes site improvements such as grading, paving, sidewalks, concrete flatwork, accessibility improvements, and utility infrastructure. It also covers selective demolition and interior and exterior building renovations, including new restrooms and upgrades to plumbing, mechanical, electrical, fire-sprinkler, and fire-alarm systems. Work must be completed in accordance with the construction drawings and specifications.
CityNJ
Posted
Oct 16, 2026
Nov 4, 2026
Mobilization, traffic control, roadway milling and repaving, concrete curb replacement, driveway apron replacement, stormwater improvements, site restoration, demobilization, and miscellaneous associated tasks.
Special DistrictMO
Posted
Sep 25, 2026
Oct 23, 2026
Project shall consist of preventative pavement maintenance for runway 16/34, taxiway a, the partial taxiway connectors located at the ends of the runways, and the apron. The preventative maintenance will include removal and replacement of all joint sealants for the areas mentioned. There will also be spall repair and slab replacement for any concrete panels where cracking or damage is observed. Any pavement markings that are damaged during construction will be replaced at no additional cost to the sponsor.