Posted
Oct 12, 2026
Nov 5, 2026
Gravel Ridge Road Sewer Extension Project RFP
Horizontal directional boring and trenching. Including 893 LF Furnish and install 2" DR-11 HDPE low pressure force main pipe via horizontal directional boring; 70 LF Furnish and install 2” DR-11 HDPE low pressure force main pipe via trenching; 1 LS Pavement Restoration, seeding, and revegetation of Disturbed Areas.
