Baty & Neely Waterline Improvements RFP
Posted
Oct 7, 2026
Oct 28, 2026
The project consists of installing an 8" waterline to complete a loop of an existing 8" waterline. The approx. length of the project is 2,500 LF. Work includes 1 LS clearing and grubbing; stump removal and tree removal; 1,890 LF of 8" waterline with native backfill; 190 LF of 8" waterline with granular backfill; 450 LF of 8" waterline direction bored; 20 LF of 3/4" water service line; 4 Ea 8" gate valve; 5 Ea fire hydrant assembly; 1 LS connection to existing waterline: 100 LF of 4" to 8" storm sewer repairs; 25 LF of 10" to 15" storm sewer repairs; 1 LS seeding and mulching. See attached files.